# Data sources

Source: https://openplovdiv.com/en/data-sources
Language: en
[LLM site index](https://openplovdiv.com/llms.txt)
[Simplified Chinese (简体中文)](https://openplovdiv.com/zh/data-sources/index.md)

This is a text version of the server-rendered page. Interactive or dynamically loaded content may be omitted.

Verifiability

Every record on the site links to a public source. Below are the main sources used and what they are for.

Last checked: 2026-07-11

[Editorial review](https://openplovdiv.com/en/history/editorial-review)

## Institutions and official documents

Municipal, state and institutional pages — decisions, registers and primary documents.

plovdiv.bg

### [Plovdiv Municipality — 2025 budget presentation](https://www.plovdiv.bg/presentation-budget-2025/)

**Used for:** Total 2025 budget, capital programme and sector shares.

Limitations

Official municipal post from the budget presentation; should be cross-checked against the adopted budget appendices when needed.

accessed 2026-06-14

plovdiv.bg

### [Plovdiv Municipality — current projects](https://www.plovdiv.bg/en/item/projects/current_projects/)

**Used for:** List of the municipality's current projects, including EU programmes.

Limitations

The page does not publish a single completed/ongoing status per project.

accessed 2026-06-14

plovdiv.bg

### [Plovdiv Municipal Council (decisions)](http://plovdiv.bg/obs/)

**Used for:** Budget and capital-programme decisions, including the 2026 provisional estimate.

Limitations

Decisions are official but are lengthy PDF documents.

accessed 2026-06-14

aop.bg

### [Public Procurement Register (AOP)](https://www.aop.bg/)

**Used for:** Verification of public tenders and contracts for specific projects.

Limitations

Requires searching by a specific contracting authority or subject.

accessed 2026-06-14

plovdiv.bg

### [Plovdiv Municipality — 2020 budget](https://www.plovdiv.bg/slider/%D0%B1%D1%8E%D0%B4%D0%B6%D0%B5%D1%82-%D0%B7%D0%B0-2020-%D0%B3%D0%BE%D0%B4%D0%B8%D0%BD%D0%B0/)

**Used for:** Plovdiv's 2020 total budget (about BGN 343M) for the multi-year trend.

Limitations

Official page; the figure is rounded (BGN 186M state + BGN 157M local).

accessed 2026-06-14

plovdiv.bg

### [Plovdiv Municipality — municipal budget archive](https://www.plovdiv.bg/item/budget-and-finance/budget/)

**Used for:** Official index of budget documents and decisions for 2014-2025.

Limitations

The page links to separate documents; older decisions are often scanned PDFs.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipal Council budget decisions, 2011-2018](https://plovdiv.bg/obs/)

**Used for:** Adopted total budgets for 2011-2018 and capital programmes where separately stated.

Limitations

Exact URLs are stored on each budget item; some documents require visual checking because they are scans.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipality — Mayors of Plovdiv](https://www.plovdiv.bg/administration/mayor/mayors-of-plovdiv/)

**Used for:** Official list of mayoral terms from 1878 to 2023.

Limitations

Names and periods are published as an archive list; it does not include biographical or political metadata.

accessed 2026-06-17

iisda.government.bg

### [Bulgarian Administrative Register — mayor of Plovdiv Municipality](https://iisda.government.bg/ras/governing_bodies/governing_body/4700)

**Used for:** Verification of the incumbent mayor and entry-into-office date as of 17 June 2026.

Limitations

Current administrative register; the record may change in a future term.

accessed 2026-06-17

fair.bg

### [International Fair Plovdiv — 1892, the beginning](https://www.fair.bg/uploads/event/form/file/5d15dd4f521c7017390091.pdf)

**Used for:** Historical record for the first Bulgarian Agricultural and Industrial Exhibition in Plovdiv.

Limitations

Short historical PDF; not a budget document.

accessed 2026-06-17

plovdiv2019.eu

### [Plovdiv 2019 — European Capital of Culture](https://plovdiv2019.eu/en)

**Used for:** Context for the 1999 Month of Culture and Plovdiv as the first Bulgarian European Capital of Culture.

Limitations

Programme website, not a municipal budget register.

accessed 2026-06-17

culture.ec.europa.eu

### [European Commission — 2019 European Capitals of Culture](https://culture.ec.europa.eu/whats-new/news/2019-european-capitals-of-culture-plovdiv-and-matera)

**Used for:** External verification that Plovdiv and Matera were European Capitals of Culture in 2019.

Limitations

Cultural-programme notice without local budget breakdowns.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipal Council Decision 58 on 2010 budget execution](https://plovdiv.bg/obs/%d0%b4%d0%b5%d0%b9%d1%81%d1%82%d0%b2%d0%b0%d1%89%d0%b8-%d0%b0%d0%ba%d1%82%d0%be%d0%b2%d0%b5/%d1%80%d0%b5%d1%88%d0%b5%d0%bd%d0%b8%d0%b5-58-1/)

**Used for:** Reported execution of the consolidated 2010 budget and budget-report context.

Limitations

This is execution as of 31.12.2010, not the initially adopted budget; it is labelled separately in charts.

accessed 2026-06-17

bulnao.government.bg

### [Bulgarian National Audit Office financial audit of Plovdiv Municipality budget as of 30 September 2002](https://www.bulnao.government.bg/media/documents/doklad_Pv.doc)

**Used for:** Adopted 2002 budget, 2002 capital expenditure and audit caveats for execution as of 30.09.2002.

Limitations

The document is an old Word file and audits execution only for 01.01-30.09.2002; charts use the cited adopted annual budget values, not the partial nine-month execution.

accessed 2026-06-17

bulnao.government.bg

### [Bulgarian National Audit Office audit of municipal property management and disposal, 1998-2005](https://www.bulnao.government.bg/media/documents/dokla_plovdiv210907.doc)

**Used for:** Strategic plans for 2001-2006 and 2005-2013, plus context on municipal-property management.

Limitations

The document is a property-management audit, not a budget statement; it is used for governance and programme context, not budget totals.

accessed 2026-06-17

bulnao.government.bg

### [Bulgarian National Audit Office follow-up on Plovdiv Municipality financial-management audit, 2006-2008](https://www.bulnao.government.bg/media/documents/DokladPoslControl_Plovdiv1.doc)

**Used for:** Follow-up measures in 2009-2010, including the 2010 annual municipal-property management programme.

Limitations

The document checks implementation of recommendations, not budget amounts; some measures are reported as partial or not implemented.

accessed 2026-06-17

strategy.bg

### [Functional analysis report for Plovdiv municipal administration, January 2009](https://www.strategy.bg/files/publications/%D0%94%D0%BE%D0%BA%D0%BB%D0%B0%D0%B4%20%D0%B7%D0%B0%20%D0%BF%D1%80%D0%BE%D0%B2%D0%B5%D0%B4%D0%B5%D0%BD%20%D1%84%D1%83%D0%BD%D0%BA%D1%86%D0%B8%D0%BE%D0%BD%D0%B0%D0%BB%D0%B5%D0%BD%20%D0%B0%D0%BD%D0%B0%D0%BB%D0%B8%D0%B7%20%D0%B2%20%D0%9E%D0%B1%D1%89%D0%B8%D0%BD%D1%81%D0%BA%D0%B0%20%D0%B0%D0%B4%D0%BC%D0%B8%D0%BD%D0%B8%D1%81%D1%82%D1%80%D0%B0%D1%86%D0%B8%D1%8F%20%D0%9F%D0%BB%D0%BE%D0%B2%D0%B4%D0%B8%D0%B2.pdf)

**Used for:** Executed capital expenditure and collected own revenue for 2005-2007; context for annual planning in 2009-2010.

Limitations

Functional analysis, not a primary budget statement; the values used are specific financial indicators, not full annual budget envelopes.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipality subsequent evaluation of the Municipal Development Plan 2007-2013](https://plovdiv.bg/obs/wp-content/uploads/2014/11/r369-pril.pdf)

**Used for:** Aggregate 2007-2013 capital-investment programme, expenditure structure and evaluation of the municipal development plan implementation.

Limitations

Scanned report checked with OCR and visual page review; used only for clearly readable aggregate values, not to extract individual rows from dense tables.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipality implementation of EU operational-programme projects, 2007-2013](https://www.plovdiv.bg/%D0%B8%D0%BD%D1%84%D0%BE%D1%80%D0%BC%D0%B0%D1%86%D0%B8%D1%8F-%D0%B7%D0%B0-%D0%B8%D0%B7%D0%BF%D1%8A%D0%BB%D0%BD%D0%B5%D0%BD%D0%B8%D0%B5%D1%82%D0%BE-%D0%BD%D0%B0-%D0%BF%D1%80%D0%BE%D0%B5%D0%BA%D1%82/)

**Used for:** Approved Plovdiv Municipality EU operational-programme projects for 2007-2013, annual approved-project values, grants and municipal co-financing.

Limitations

The post mixes submitted, approved and received-to-date values; the figures are programme/project approvals, not annual municipal budgets.

accessed 2026-06-17

bulnao.government.bg

### [Bulgarian National Audit Office audit report on Plovdiv Municipality 2010 annual financial report](https://www.bulnao.government.bg/bg/articles/download/4485/17-DOKL-GFO-PLOVDIV-2010-REDAK.doc)

**Used for:** Verification that the 2010 budget execution report was audited and certified without material errors.

Limitations

The document is an old Word file and describes audit findings; concrete budget rows are taken from the Municipal Council decision.

accessed 2026-06-17

rimplovdiv.com

### [Regional History Museum Plovdiv — The role of Plovdiv Municipality in city development, 1886-1944](https://rimplovdiv.com/wp-content/uploads/2025/12/rolqta.pdf)

**Used for:** Historical finance, governance and programme records for 1878-1944.

Limitations

Scholarly historical study, not a primary budget register; old lev amounts are nominal and not directly comparable with modern BGN.

accessed 2026-06-17

rimplovdiv.com

### [Regional History Museum Plovdiv — Plovdiv Municipality and the building of city and tourism infrastructure, 1944-1990](https://rimplovdiv.com/wp-content/uploads/2025/12/infrastruktura.pdf)

**Used for:** Postwar finance, governance and programme records for 1944-1990.

Limitations

Scholarly historical study, not a primary budget register; socialist-period lev amounts are nominal and not directly comparable with modern BGN.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipal Council Decision 32 from 28 January 2011](https://plovdiv.bg/obs/%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%D0%B0%D1%89%D0%B8-%D0%B0%D0%BA%D1%82%D0%BE%D0%B2%D0%B5/%D1%80%D0%B5%D1%88%D0%B5%D0%BD%D0%B8%D0%B5-32-1/)

**Used for:** Targeted infrastructure works linked to the 2009 decisions to accept baled waste from Sofia Municipality.

Limitations

The decision amends earlier decisions and describes targeted funded works, not the full municipal budget.

accessed 2026-06-17

ciela.net

### [State Gazette — Council of Ministers Decree 149 from 29 June 2007](https://www.ciela.net/svobodna-zona-darjaven-vestnik/document/2135557333/issue/3089/postanovlenie-%E2%84%96-149-ot-29-yuni-2007-g-za-odobryavane-na-dopalnitelni-byudzhetni-krediti-po-byudzheta-na-obshtina-plovdiv-za-2007-g-za-finansirane-na-infrastrukturni-obekti)

**Used for:** Additional 2007 budget credits for two Plovdiv Municipality infrastructure works.

Limitations

Public legal-information copy of the State Gazette act; the decree is a targeted transfer, not a full municipal budget.

accessed 2026-06-17

dv.parliament.bg

### [State Gazette — Council of Ministers Decree 72 from 30 March 2009](https://dv.parliament.bg/DVWeb/showMaterialDV.jsp?idMat=18235)

**Used for:** Additional targeted capital-expenditure subsidy in 2009; the Plovdiv Municipality line is BGN 2M for beautification/public works.

Limitations

Large State Gazette HTML copy; the specific Plovdiv row was checked against the tabular legal-information copy. This is a targeted subsidy, not a municipal budget.

accessed 2026-06-17

dv.parliament.bg

### [State Gazette — Council of Ministers Decree 138 from 15 July 2010](https://dv.parliament.bg/DVWeb/showMaterialDV.jsp?idMat=35023)

**Used for:** Additional 2010 budget credits for Plovdiv Municipality infrastructure works linked to accepting baled waste.

Limitations

The decree is a targeted transfer for specific works, not an annual municipal budget; one project line was amended by Decree 289 in December 2010.

accessed 2026-06-17

dv.parliament.bg

### [State Gazette — Council of Ministers Decree 289 from 7 December 2010](https://dv.parliament.bg/DVWeb/showMaterialDV.jsp?idMat=41615)

**Used for:** Amendment of Decree 138 redirecting BGN 2M to major repair, reconstruction and conversion of the Plovdiv City House of Culture.

Limitations

The amendment affects one line in the targeted transfer under Decree 138; it is not a standalone annual budget framework.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipality — BGN 8.4M from the Council of Ministers for infrastructure](https://www.plovdiv.bg/%D0%BE%D0%B1%D1%89%D0%B8%D0%BD%D0%B0-%D0%BF%D0%BB%D0%BE%D0%B2%D0%B4%D0%B8%D0%B2-%D0%BF%D0%BE%D0%BB%D1%83%D1%87%D0%B0%D0%B2%D0%B0-%D0%BE%D1%82-%D0%BC%D1%81-84-%D0%BC%D0%BB%D0%BD-%D0%BB%D0%B2-%D0%B7/)

**Used for:** Final BGN 8,488,887 transfer and BGN 26.5M total granted for 2009-2012 in connection with Sofia's baled waste.

Limitations

Short municipal post; used for the transfer amount and aggregate granted amount, not for a detailed project list.

accessed 2026-06-17

ciela.net

### [State Gazette — Council of Ministers Decree 307 from 30 November 2012](https://www.ciela.net/svobodna-zona-darjaven-vestnik/document/2135827830/issue/4772/postanovlenie-%E2%84%96-307-ot-30-noemvri-2012-g-za-odobryavane-na-dopalnitelni-byudzhetni-krediti-po-byudzheta-na-obshtina-plovdiv-vav-vrazka-s-priemaneto-i-deponiraneto-na-100-000-tona-balirani-neopasni-bitovi-otpadatsi-generirani-na-teritoriyata-na-stolichnata-ob)

**Used for:** Legal basis and list of infrastructure works attached to the final BGN 8,488,887 transfer in 2012.

Limitations

Public legal-information copy of the State Gazette act; the amount is a targeted transfer, not a full budget.

accessed 2026-06-17

plovdiv.bg

### [Plovdiv Municipal Council rule for support to gifted children](https://plovdiv.bg/obs/%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%D0%B0%D1%89%D0%B8-%D0%B0%D0%BA%D1%82%D0%BE%D0%B2%D0%B5/%D0%BF%D1%80%D0%B0%D0%B2%D0%B8%D0%BB%D0%BD%D0%B8%D0%BA-%D0%B7%D0%B0-%D0%BF%D0%BE%D0%B4%D0%BF%D0%BE%D0%BC%D0%B0%D0%B3%D0%B0%D0%BD%D0%B5-%D0%BD%D0%B0-%D0%B4%D0%B5%D1%86%D0%B0-%D1%81-%D0%B8%D0%B7%D1%8F/)

**Used for:** Municipal programme for one-off financial support to gifted schoolchildren, adopted in 2010.

Limitations

The rule defines individual grants and procedure, but does not publish the programme's annual total budget.

accessed 2026-06-17

plovdiv2019.eu

### [Plovdiv 2019 — Kapana Creative District](https://plovdiv2019.eu/en/platform/transforms/130-urban-dreams/418-kapana-creative-district)

**Used for:** The 2014 launch, open calls, and support for studios, galleries, and creative spaces in Kapana.

Limitations

Official Plovdiv 2019 Foundation project page; it documents the creative-district programme rather than the quarter's complete history.

accessed 2026-07-11

## Media

Press reports — used when the official document is not published online; see each record's limitations.

trafficnews.bg

### [TrafficNews — Plovdiv 2025 budget](https://trafficnews.bg/plovdiv/obshtina-plovdiv-shte-harchi-715-mln-leva-prez-2025-a-chaka-341501/)

**Used for:** Total of BGN 715,154,301, the capital programme and projects starting in 2025.

Limitations

Media report based on the municipality's draft budget.

accessed 2026-06-14

podtepeto.com

### [Pod tepeto — 2026 capital programme](https://podtepeto.com/aktualno/obsthina-plovdiv-planira-blizo-87-mln-evro-za-kapitalovi-razhodi-prez-2026-g/)

**Used for:** Provisional 2026 capital programme, funding sources and the two state-subsidy projects.

Limitations

Provisional estimate — figures may change once the state budget is adopted.

accessed 2026-06-14

darik.bg

### [Darik — Plovdiv's first budget in euros](https://darik.bg/parvi-budzet-v-evro-za-plovdiv-vliza-na-glasuvane-v-obstinskia-savet~503815.html)

**Used for:** Context for the 2026 budget — the first prepared in euros.

Limitations

Media report from the budget-voting stage.

accessed 2026-06-14

trafficnews.bg

### [TrafficNews — 2026 draft budget and frozen projects](https://trafficnews.bg/plovdiv/bez-promiana-plovdiv-noviia-byudzhet-no-zamraziha-15-golemi-363745/)

**Used for:** Projects expected to receive 2026 funding, new projects expected to start in 2026 and projects with forecast financing of BGN 0 for 2025-2026.

Limitations

Media report based on the draft budget/Appendix 3; not an official project-by-project status register.

accessed 2026-06-14

old-news.bnr.bg

### [BNR — adopted Plovdiv 2019 budget](https://old-news.bnr.bg/plovdiv/post/101075189/prieha-budjeta-na-plovdiv-kapitalovata-programa-e-za-60-miliona-leva)

**Used for:** Plovdiv's 2019 total budget (BGN 341,959,020, adopted) for the multi-year trend.

Limitations

Media report from the budget adoption.

accessed 2026-06-14

plovdiv24.bg

### [Plovdiv24.bg — record budget of BGN 260,702,383](https://www.plovdiv24.bg/novini/plovdiv/Rekorden-byudzhet-260-702-383-leva-79980)

**Used for:** Adopted 2009 total budget and 2009 capital expenditure in the annual budget trend.

Limitations

Contemporary media report from the budget vote; the official 2009 decision/appendices were not found in the public budget archive as of 17 June 2026.

accessed 2026-06-17

marica.bg

### [Marica — Plovdiv 2021 budget](https://www.marica.bg/plovdiv/politika/byudjetat-na-plovdiv-za-2021-g-mestnite-danaci-i-taksi-bez-promqna-izbivat-lipsite-s-po-skapi-uslugi)

**Used for:** Plovdiv's 2021 total budget (BGN 345,631,629, as initially adopted) for the multi-year trend.

Limitations

Media report; the initially adopted amount was later updated.

accessed 2026-06-14

news.bg

### [news.bg — adopted Plovdiv 2022 budget](https://news.bg/politics/prieha-rekorden-byudzhet-na-obshtina-plovdiv-nad-526-mln-lv.html)

**Used for:** Plovdiv's 2022 total budget (about BGN 526M) for the multi-year trend.

Limitations

Media report; the adopted amount may differ after updates.

accessed 2026-06-14

focus-news.net

### [Focus News — Plovdiv 2023 budget](https://www.focus-news.net/novini/regioni/Proektobyudzhetut-na-Plovdiv-za-2023-g-e-655-255-005-leva-13-otiva-za-zaplati-1795125)

**Used for:** Plovdiv's 2023 total budget (BGN 655,255,005) for the multi-year trend.

Limitations

Media report based on the 2023 draft budget.

accessed 2026-06-14

marica.bg

### [Marica — Plovdiv 2024 budget](https://www.marica.bg/plovdiv/gradat/byudjetat-na-plovdiv-pod-indigo-samo-29-mln-leva-rast)

**Used for:** Plovdiv's 2024 total budget (about BGN 684M; ~BGN 29M up on 2023).

Limitations

Media report; the figure is approximate.

accessed 2026-06-14

marica.bg

### [Marica — Plovdiv 2024 capital programme](https://www.marica.bg/plovdiv/gradat/byudjet-2024-na-plovdiv-nay-mnogo-pari-za-obrazovanie-nqma-da-se-vdigat-danacite)

**Used for:** Plovdiv's 2024 capital programme (BGN 123,375,273) for the by-year trend.

Limitations

Media report based on the mayor's budget presentation.

accessed 2026-06-14

podtepeto.com

### [Pod tepeto archive on Plovdiv 1999 European Month of Culture](https://podtepeto.com/aktualno/arhivite-razkazvat-plovdiv-99-evropejski-mesec-na-kulturata/)

**Used for:** Scale and programme of the 1999 European Month of Culture: participants, countries, events and related venue repairs.

Limitations

Media archive article citing a contemporary Kultura newspaper report; it does not include a municipal budget or expenditure statement.

accessed 2026-06-17

gradat.bg

### [Gradat — Plovdiv Municipality with a BGN 218.3M draft budget](https://gradat.bg/news/2008/02/16/459862_obshtina_plovdiv_s_proektobjudjet_ot_2183_mln_leva)

**Used for:** Contemporary report on the 2008 draft budget, planned capital expenditure and specific infrastructure priorities.

Limitations

This is a secondary media source on a draft budget, not an official adopted or executed budget decision; the record is archive context and is not used as an annual budget total.

accessed 2026-06-17

gradat.bg

### [Gradat — infrastructure as a focus in Plovdiv's 2010 draft budget](https://gradat.bg/forumgradat/2010/02/08/854044_infrastrukturata_e_osnoven_akcent_v_bjudjetite_na)

**Used for:** Context for the 2010 draft budget, planned infrastructure spending and comparison with reported 2009 execution.

Limitations

Secondary media source on a draft budget and planned amounts; not used as an official adopted or executed annual budget.

accessed 2026-06-17

visitkapana.bg

### [Kapana — development of the quarter, 1890–1995](https://visitkapana.bg/2017/04/10/%D1%80%D0%B0%D0%B7%D0%B2%D0%B8%D1%82%D0%B8%D0%B5%D1%82%D0%BE-%D0%BD%D0%B0-%D0%BA%D0%B0%D0%BF%D0%B0%D0%BD%D0%B0-1890-1995/)

**Used for:** The 1906 fire, the 1970s clearance plan, and the subsequent preservation and renewal of Kapana.

Limitations

Public history article from the Visit Kapana project; exact dates and quantities remain subject to editorial cross-checking with municipal archives.

accessed 2026-07-11

podtepeto.com

### [Pod tepeto — the 1957 Plovdiv flood](https://podtepeto.com/besedka-za-grada/navodnenieto-prez-1957-g-ostavilo-10500-plovdivchani-bez-pokriv/)

**Used for:** The mayor's report on the 1957 flood, more than 10,000 people left homeless, and the subsequent construction of hundreds of dwellings.

Limitations

Journalistic account based on a surviving mayoral report; used for scale and urban consequences without substituting for the primary document.

accessed 2026-07-11

podtepeto.com

### [Pod tepeto — how Stolipinovo emerged](https://podtepeto.com/aktualno/kak-se-e-rodilo-stolipinovo/)

**Used for:** The construction of several hundred Stolipinovo dwellings for Roma families affected by the 1957 flood.

Limitations

Journalistic public-history article; outdated terminology for the Roma community in the original is not reproduced.

accessed 2026-07-11

bg.wikipedia.org

### [Bulgarian Wikipedia — Kapana](https://bg.wikipedia.org/wiki/%D0%9A%D0%B0%D0%BF%D0%B0%D0%BD%D0%B0)

**Used for:** Kapana's name, early development, craft streets, and historical chronology.

Limitations

General secondary source; used as an overview and supplemented by Visit Kapana and Plovdiv 2019 project pages.

accessed 2026-07-11

oldplovdiv.bg

### [Old Plovdiv — Permanent exhibition of Zlatyu Boyadzhiev](https://oldplovdiv.bg/en/sights/10)

**Used for:** Dr Stoyan Chomakov House, the permanent exhibition since 1984, and Zlatyu Boyadzhiev's two creative periods.

Limitations

Official Old Plovdiv municipal institute page for the building and permanent exhibition.

accessed 2026-07-11

visitplovdiv.com

### [Visit Plovdiv — History of Tsar Simeon Garden](https://www.visitplovdiv.com/en/node/3118)

**Used for:** The creation of Tsar Simeon Garden by Lucien Chevalas on an old Turkish cemetery for the 1892 exhibition.

Limitations

Official Plovdiv municipal tourism page; used for the park's history and its connection to the exhibition.

accessed 2026-07-11

libplovdiv.com

### [Ivan Vazov Public Library — The Building](https://www.libplovdiv.com/index.php/en/sgradata-en)

**Used for:** The Ivan Vazov Public Library's move into its present purpose-built home in 1974.

Limitations

Official library page about the current building; it is not a chronicle of the 1928 earthquake damage.

accessed 2026-07-11

## Open data

Open databases and repositories — coordinates, images and structured data.

openstreetmap.org

### [OpenStreetMap](https://www.openstreetmap.org/)

**Used for:** Map base layer and spatial context.

Limitations

Map data is community-maintained and may be incomplete.

accessed 2026-06-14

wikidata.org

### [Wikidata](https://www.wikidata.org/)

**Used for:** Wikidata IDs and first family/kinship relationship statements between people already present in the prosopography.

Limitations

Used as a structured public source for starter relationship links; each relationship still awaits independent editorial review.

accessed 2026-06-19

commons.wikimedia.org

### [Wikimedia Commons — Historical images of Plovdiv](https://commons.wikimedia.org/wiki/Category:Historical_images_of_Plovdiv)

**Used for:** Historical photographs, postcards, file pages and license metadata for the georeferenced archive layer and then/now pairs.

Limitations

The category is an entry point; reuse terms are checked at individual Commons file level and stored on the archive JSON records.

accessed 2026-06-19

commons.wikimedia.org

### [Wikimedia Commons — Bulgarian Archives State Agency cooperation files](https://commons.wikimedia.org/wiki/Commons:Bulgarian_Archives_State_Agency)

**Used for:** Public-domain archive photographs and maps from Bulgarian Archives State Agency uploads used in the archive layer.

Limitations

The page describes the cooperation and general archival source; specific rights and credits are preserved at Commons file level.

accessed 2026-06-19
